|
We have been involved in the successful installation and support of Materials Requirements Planning (MRP I) and Manufacturing Resources Planning (MRP II) systems. We are familiar with the interdisciplinary pressures, dedication, co-operation and commitment required to successfully implement and maintain MRP and MRP II systems. These systems involve the interplay of sales, purchasing, production, inventory and capacity planning groups.
Over thee years we have had considerable involvement with the development and support of various manufacturing systems. Some specific manufacturing systems that we have developed and supported include:
- Storage and retrieval systems for inventory control
- RF (radio frequency) controlled hand-held and forklift mounted terminals
- EDI (electronic data interchange) for receipts of orders and transmission of shipments
- Shop floor automation
- Interfaces to/from PLCs (programmable logic controllers)
- Simulation models of production scheduling and of inventory shipping systems
|